Project name |
Residential complex in Temryuk on street Andjiyevskogo |
Location of the project |
Temrukskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Construction of apartment houses in the residential complex in Temryuk Andjiyevskogo street. |
Project capacity |
17550 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
220,5591 million rubles |
Investment capacity, mln rubles |
220,5591 million rubles |
Conditions of investor participation |
Direct investments |
Payback period |
3,48 years |
Land characteristics |
Location |
Temryuk District, Temryuk, Andjiyevskogo street |
Land plot area (m2) |
13552 m2 |
Ground categories |
settlement land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
To provide construction of 10 kV line |
Connection point will be determined when designing |
Gas supply |
High pressure underground pipeline D=110 mm |
Connection point at Anjievskogo street - 50 m |
Water supply |
Town lines network D=150 mm |
Connection point at Anjievskogo street - 100 m |
Sewerage system |
Asbestos cement pipeline D=300 mm |
70 m |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Temryuk town |
- |
Center of federal subject |
Krasnodar city |
160 |
Highway (regional, federal significance) |
Motorway “Novorossiysk- Kerch Channel” |
15 |
Roads of local significance |
Motorway Yuzhnyi bypass of Temryuk |
1 |
Nearest railway station |
Railway station Temryuk |
10 |
Nearest railway lines |
Temryuk railway |
10 |
Airport |
Anapa town |
40 |
Seaport |
1) Port Temryuk; 2) Port Kavkaz |
1) 7; 2) 75 |