Project name |
Building of an inhabited complex of cottage type |
Location of the project |
Tihoretskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
As part of the project is planned to build a residential complex comprising 150 houses. |
Project capacity |
The average area of the cottage will be approximately 100 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
295,2 million rubles |
Investment capacity, mln rubles |
295,2 million rubles |
Conditions of investor participation |
Direct investment in 100% of |
Payback period |
3,4 years |
Land characteristics |
Location |
Krasnodar territo54ry, Tihoretsky area, the item Neworogdestwenskaya, street of Marshal Zhukov |
Land plot area (m2) |
492000 sq |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Connection point to electric networks of Open Society \"Kubanenergo\" - PS 35/10 kV \"Neworogdestvenskaya\" |
520 |
Gas supply |
Point of connection gas distributive station \"Tihoretsky\" |
1100 |
Water supply |
Drilling of an artesian chink, installation of a water tower \"Rozhnovsky\" |
- |
Sewerage system |
Building of a sewer well (septic tank) |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
City Tikhoretsk |
24 |
Center of federal subject |
Krasnodar ñity |
152 |
Highway (regional, federal significance) |
FAD \"Caucasus\" |
29 |
Roads of local significance |
pos. Stone |
0,05 |
Nearest railway station |
Station Tikhoretskaya |
24 |
Nearest railway lines |
Station Tikhoretskaya |
24 |
Airport |
Krasnodar |
152 |
Seaport |
Yeisk |
203 |