Project name |
Building of group of apartment houses from 5 floors: three on 45 apartments, two on 30 apartments, one on 60 apartments |
Location of the project |
Gulkevichskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Building of group of 5-storeyed apartment houses: three 45-room, two 30-room, one 60-room for realisation further a floor space in the market of the real estate of Gulkevichsky area |
Project capacity |
13,8 thousand in sq. m of ready habitation |
Financial estimation of the project |
Total cost of the project, mln rubles |
207,8 |
Investment capacity, mln rubles |
207,8 |
Conditions of investor participation |
Direct investments |
Payback period |
3,5 years |
Land characteristics |
Location |
Krasnodar territory, Gulkevichi city, quarter of streets Leningradskaya, Ekaterinodarskaya, Stolbovaya |
Land plot area (m2) |
14 262 Sq. m |
Ground categories |
the earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
high-voltage electric main 10 kW |
In ground area territory |
Gas supply |
High pressure D 159 mm |
300 m from street Abrikosovaya with installation of a case of distribution of gas |
Water supply |
D 200 mm |
210 m |
Sewerage system |
Building of sewer pump station is necessary |
70 m from projected sewer pump station |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Gulkevichi city |
It is located on a city territory |
Center of federal subject |
Krasnodar city |
165 |
Highway (regional, federal significance) |
Ì29 Rostow-Mahachkala |
5 |
Roads of local significance |
Gulkevichi-Kropotkin |
0,1 |
Nearest railway station |
station Gulkevichi |
2 |
Nearest railway lines |
station Gulkevichi |
2 |
Airport |
Krasnodar city |
165 |
Seaport |
Novorossisk city |
314 |