Project name |
Building of quickly erected houses |
Location of the project |
Kurganinskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Houses building of quickly erected prefabricated elements, total house area is 120 sq.m., kitchen-20 sq.m., bathroom-8 sq.m., 3 living room of total area 70 sq.m., utility rooms – 22 sq.m. |
Project capacity |
Project includes the commission of 8 280 square meters of ready houses |
Financial estimation of the project |
Total cost of the project, mln rubles |
156,035 mln.rub |
Investment capacity, mln rubles |
156,035 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
2,7 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, 173 kvartal, Sadovaya street,250 |
Land plot area (m2) |
85 666 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-0,4 kilovolt on the Sadovaya street, construction of transforming station of GKTPN-250 kVA type |
25 |
Gas supply |
From the operating high pressure gas pipeline on the Sverdlova street |
300 |
Water supply |
From the operating water supply system on the crossing of Lenina street and Rodnikovskaya street |
400 |
Sewerage system |
In the operating sewerage system on the Lenina street (a/c 300 mm) |
800 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
177 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
1,0 |
Roads of local significance |
Sadovaya street |
0,001 |
Nearest railway station |
Kurgannaya station |
7,4 |
Nearest railway lines |
Kurganinsk-Shedok |
2,0 |
Airport |
Krasnodar city |
180 |
Seaport |
Tuapse city |
350 |