Project name |
Building of a housing estate "World" |
Location of the project |
Krimskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Production realised under the present project, the inhabited real estate - cottages from quickly erected a material of 12 houses is. Objects erected within the limits of the given project will possess high appeal to potential buyers, and uniqueness of an erected complex in view of original architectural decisions and a favourable site, considerably raises its competitiveness. Under construction apartment houses will represent elite two-storeyed cottages. |
Project capacity |
The first stage (2012): Sale of houses — Sq.m.600 Tenancy of houses- Sq.m.840 The second stage (2013): Sale of houses — Sq.m.600 Tenancy of houses- Sq.m.240 The third stage (2014): Sale of houses — Sq.m.240 Tenancy of houses- Sq.m.0 |
Financial estimation of the project |
Total cost of the project, mln rubles |
27,391 million rbl. |
Investment capacity, mln rubles |
27,391 million rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
3,1 years |
Land characteristics |
Location |
The Krymsk area, Merchansky rural settlement farm the Speech |
Land plot area (m2) |
39 000 sq.m. |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
0,1 MW |
The electrical supply is possible from PS 35 kV \"Merchansky\" under the contract of technological joining. – 5000 m |
Gas supply |
Loading 0,17 mil.m3/year |
The connection point will be defined by updating under condition of building street gas pipelines in farm. |
Water supply |
Consumption 3,9 m3/chut. There is a waterpipe of Du-100mm, a pressure 1,2-1,5 atm. |
Waterpipe from polyethylene pipes in. A speech – 2000 m |
Sewerage system |
No, the device of cesspools |
No |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Krymsk |
25 |
Center of federal subject |
The city of Krasnodar |
103 |
Highway (regional, federal significance) |
Krasnodar-Novorossisk |
9 |
Roads of local significance |
Are lengthways expensive |
0 |
Nearest railway station |
The Krymsk |
23 |
Nearest railway lines |
Ry Krasnodar-Novorossisk |
8 |
Airport |
Krasnodar |
104 |
Seaport |
Novorossijsk |
67 |