Project name |
Building of quickly erected houses in stanitsa Rodnikovskaya |
Location of the project |
Kurganinskiy district |
Industry classification |
House building |
Basic information about the project |
Project essence |
Houses building of quickly erected prefabricated elements |
Project capacity |
Project includes the commission of 2400 square meters of ready houses |
Financial estimation of the project |
Total cost of the project, mln rubles |
47,665 mln.rub |
Investment capacity, mln rubles |
47,665 mln.rub |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
2 years |
Land characteristics |
Location |
Kurganinsky district, stanitsa Rodnikovskaya, the land plot is situated approximately in 45 meters to the west of reference point the house located out of land plot. Reference point address is Maikopskaya street, 464 |
Land plot area (m2) |
24 000 square meters |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10 kilovolt |
20,0 |
Gas supply |
Operating gas pipeline |
1000,0 |
Water supply |
Cast iron, diameter 150 mm |
2500,0 |
Sewerage system |
- |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
17 |
Center of federal subject |
Krasnodar city |
195 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,08 |
Roads of local significance |
Maykopskaya street |
0,03 |
Nearest railway station |
Kurgannaya station |
24,5 |
Nearest railway lines |
Kurganinsk-Shedok |
2,5 |
Airport |
Krasnodar city |
198 |
Seaport |
Tuapse city |
350 |