Location of a factory for the production of low fast raising houses

Project name Location of a factory for the production of low fast raising houses
Location of the project Krasnoarmejskiy district
Industry classification Production of construction materials
Basic information about the project
Project essence Realization of the project provides the following purposes: - construction and usage of the plant, which will provide the full complex of the production of all elements of the house building (the wall material, plate of the overlapping, stair march, roofing, besides, transport concrete)
Project capacity production of house building elements in volume 269 471 m? per year;
Financial estimation of the project
Total cost of the project, mln rubles 300,0 mln. rub.
Investment capacity, mln rubles 300,0 mln. rub.
Conditions of investor participation Direct investments
Payback period 4,7 years
Land characteristics
Location Krasnoarmeisky district, Poltavskaya village
Land plot area (m2) 29 000 sq.m.
Ground categories Land settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply it is necessary to construct the substation Air Lines 10 kV from Air Lines 10 K 18 (Krasnoarmeyskaya 18) 1000
Gas supply Existing gas supply system 1000
Water supply It is necessary to construct water intake facilities to provide the plant with the artesian boring -
Sewerage system Existing sewage installations of Poltava cannery 100
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Poltavskaya village 1
Center of federal subject Krasnodar 70
Highway (regional, federal significance) Temriuk-Krasnodar-Kropotkin Krymsk - Tymashevsk 0,8
Roads of local significance Central street 0,4
Nearest railway station Poltavskaya station 2,5
Nearest railway lines Railroad route Krymsk - Tymashevsk 2,3
Airport Krasnodar 90
Seaport Novorossiysk 100