Project name |
Combine building on production aircreats blocks |
Location of the project |
Labinskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Creation in territory of Labinsk area of competitive and highly profitable sector of manufacture of building materials and the accompanying industry |
Project capacity |
61200 cubic m. a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
60 million rbl |
Investment capacity, mln rubles |
60 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
3,9 years |
Land characteristics |
Location |
Labinsk, a southern industrial zone |
Cadastral number of quarter |
20000,0 m2 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
ΛέΟ 0,4 and 10 kw |
50 |
Gas supply |
D 100 μμ |
50 |
Water supply |
D 100 μμ |
10 |
Sewerage system |
- |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
- |
Center of federal subject |
Krasnodar city |
200 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
1 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
- |
Nearest railway station |
Station Labinsk |
4 |
Nearest railway lines |
|
2 |
Airport |
Krasnodar city |
212 |
Seaport |
Tuapse city |
192 |