Project name |
Reconstruction of factory of iron-concrete products for placing of house-building combine |
Location of the project |
Labinskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Creation of modern house-building combine with a full cycle of the manufacture, carrying out complete manufacturing of elements (designs, details) prefabrication buildings, their transportation on a building site, installation and after installation works with delivery of ready buildings. The project provides to place house-building combine on industrial base of factory of ferro-concrete products |
Project capacity |
63 500 êóá. ì. ñòðîèòåëüíûõ êîíñòðóêöèé |
Financial estimation of the project |
Total cost of the project, mln rubles |
100 million rbl |
Investment capacity, mln rubles |
100 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
3,8 years |
Land characteristics |
Location |
Labinsk, a southern industrial zone |
Land plot area (m2) |
215121,0 m2 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 0,4 kWt |
250,0 |
Gas supply |
- |
- |
Water supply |
16 cubic m./hour |
In borders of a considered site |
Sewerage system |
D – 100 mm |
In borders of a considered site |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
- |
Center of federal subject |
Krasnodar city |
210 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
1,5 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
- |
Nearest railway station |
Station Labinsk |
6 |
Nearest railway lines |
- |
0,2 |
Airport |
Krasnodar city |
210 |
Seaport |
Tuapse city |
190 |