Project name |
Construction of mineral basalt wool production plant |
Location of the project |
Kavkazskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Construction of mineral basalt wool production plant Considered in business plan enterprise will produce the necessary product: - A Mineral cotton wool on base of the basalt filaments - A Mineral cotton wool on base fiberglass |
Project capacity |
Project capacity - 40 000 tons per annum; including: P-75 (for walls) 60% - 24 000 tons P-125 (for roofs) 40% - 16 000 tons. |
Financial estimation of the project |
Total cost of the project, mln rubles |
340,660 |
Investment capacity, mln rubles |
340,660 |
Conditions of investor participation |
Direct investments |
Payback period |
4,7 |
Land characteristics |
Location |
1.v Magistralnaya Street, Kropotkin, Kavkazskiy district. |
Land plot area (m2) |
85000 |
Ground categories |
Agricultural lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Kropotkin Substation 330/-/6kV 220 MW |
1600 |
Gas supply |
Kropotkin high pressure gas-distributing station |
3300 |
Water supply |
Artesian boreholes No.46, No.47 |
1800 and 2000 |
Sewerage system |
Sewage system D 300 mm on Setevaya Street |
1500 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Kropotkin |
6,35 |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
FAD "Caucasus" |
2,6 0,7 |
Roads of local significance |
Stavropoli - Temryuk - Krasnodar |
0,7 |
Nearest railway station |
Railway Station “Kavkazskaya |
6,0 |
Nearest railway lines |
“Russian Railways” ÎŔÎ |
0,65 |
Airport |
city Krasnodar |
140 |
Seaport |
city Novorossiysk |
270 |