Building of the shop for the production of building materials

Project name Building of the shop for the production of building materials
Location of the project Kavkazskiy district
Industry classification Production of construction materials
Basic information about the project
Project essence Building of the factory of production of concrete
Project capacity 18720 ì2 blocks of concrete
Financial estimation of the project
Total cost of the project, mln rubles 22,0
Investment capacity, mln rubles 22,0
Conditions of investor participation Direct investments
Payback period 4,2
Land characteristics
Location Kropotkin, Kavkazki district
Land plot area (m2) 1000
Ground categories lands of the inhabited areas
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Source of power supply-a feeder ¹54 PS330 êW «Êropotkinskaya», the point of connection – VL-6 êW a feeder ¹54 2200
Gas supply absent -
Water supply Steel water supply pipeline D – 100 mm on OOO TEMP 10
Sewerage system It is possible to connect to head-drift sewerage collector OAO Kropotkinski plant MSSP or building of local cleansing constraction -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kropotkin 2,0
Center of federal subject Krasnodar city 140
Highway (regional, federal significance) Federal highway “Kavkaz” Motor road of regional significance “Temryuk – Krasnodar - Stavropol” 2,9 2,0
Roads of local significance Promishlenni proezd st.4 the road with asphalt covering 0,005
Nearest railway station Main station Kavkazkaya 5,6
Nearest railway lines OAO “Russian railways” 5,6
Airport Krasnodar city 140
Seaport Novorossiysk 265