Project name |
Construction of the combine on construction of the houses |
Location of the project |
Kavkazskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
The Organization of the flow fabrication of the building materials and assembly raised quickly buildings. In sphere of activity of the enterprise also enters designing a construction, all types of the civil and erection work on all amounts that will provide unity and receivership of each stage of the project on length of whole process to his(its) realization |
Project capacity |
97 407 kv. m. sandwich-panels, 4000 tons of I-beems, 70 230 kv. m. vein |
Financial estimation of the project |
Total cost of the project, mln rubles |
170,83 |
Investment capacity, mln rubles |
170,83 |
Conditions of investor participation |
Direct investment |
Payback period |
4,5 |
Land characteristics |
Location |
g. Kropotkin, str. Technical, 2-a |
Land plot area (m2) |
46590 |
Ground categories |
Lands of the populated points |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
0,6 mVt, PS 330-6 sq "Kropotkin", feeder 54 |
200 |
Gas supply |
GRS high pressure |
3300 |
Water supply |
Town networks 100 mm. |
2000 è 2200 |
Sewerage system |
Town networks to sewerages 300 mm. |
250 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Kropotkin |
6,4 |
Center of federal subject |
city Krasnodar |
140 |
Highway (regional, federal significance) |
FAD "Caucasus"; the car road Temryuk-Krasnodar-Kropotkin; before superhighway marginal car road Tbilisskaya - Kropotkin, with asphalt concrete covering |
3,7 3,6 1,6 |
Roads of local significance |
gravel road - a journey 2 Promishlenniy |
0,05 |
Nearest railway station |
Railway station "Caucasian" |
6,2 |
Nearest railway lines |
OAO "RZHD", branch line on west production zone |
0,9 |
Airport |
Krasnodar |
140 |
Seaport |
Novorossiysk |
270 |