Project name |
Construction of a plant for the production of building materials |
Location of the project |
Belorechenskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
It is planned to construct of a plant for the production of foam blocks at the territory of the Pshekhskoye rural settlement. |
Project capacity |
33 264 cubic meters/month. |
Financial estimation of the project |
Total cost of the project, mln rubles |
29.6 mln. rubles. Own funds in the amount of 9.1 mln. rubles. (30%). A bank credit in the amount of 20. 5 mln. rubles. (70%). |
Investment capacity, mln rubles |
20.5 mln. rubles. |
Conditions of investor participation |
direct investments. |
Payback period |
2.5 years. |
Land characteristics |
Location |
Krasnodar Region, Belorechensky District, Pshekhskoye rural settlement. |
Land plot area (m2) |
9 000 sq.m. |
Ground categories |
lands of settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
35 kilovolts “Pshekhskaya”, |
400 m. |
Gas supply |
None |
drilling an artesian well with a flow rate of not less than 20 cubic meters/hour |
Water supply |
None |
it requires to design a compact plant of sewage treatment with a capacity of capacity of not less than 100 cubic meters/hour. |
Sewerage system |
None |
construction of lines and structures of communication is required. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belorechensk City |
10.32 km |
Center of federal subject |
Krasnodar City |
105.2 km |
Highway (regional, federal significance) |
|
0.2 km |
Nearest railway station |
Belorechenskaya |
5.05 km |
Nearest railway lines |
|
5.05 km |
Airport |
Krasnodar City |
103.3 km |
Seaport |
Novorossiysk City |
240.3 km |