Project name |
Construction of the plant for tapestry bricks production |
Location of the project |
Uspenskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Brick-plant – the enterprise with a cyclical turnaround production. Automation with use of computer systems provides task description under the received order for all cycle, support and management of all technological process, up to non-destructive monitoring and passport-certificate drafting. |
Project capacity |
The planned capacity of the plant – 15 mln. units of bricks a year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
271,7 mln.rub |
Investment capacity, mln rubles |
271,7 mln.rub |
Conditions of investor participation |
Direct investment |
Payback period |
4,5 |
Land characteristics |
Location |
Krasnodar region, Uspensky district, village Konokovo, industrial zone |
Land plot area (m2) |
60 000 sq.m. |
Ground categories |
Lands of settlement. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
TS 10/0,4 kW, 10 kW |
10 |
Gas supply |
D=89 mm |
100 |
Water supply |
D=100 mm |
150 |
Sewerage system |
Local |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
central part of the v.Uspenskoe |
3 |
Center of federal subject |
City Krasnodar |
250 |
Highway (regional, federal significance) |
Federal road “Caucasus” |
2 |
Roads of local significance |
«Entrance to the city of Armavir» |
0,5 |
Nearest railway station |
rail road station “Konokovo” |
2 |
Nearest railway lines |
rail road station “Konokovo” |
2 |
Airport |
Airport – city Krasnodar |
230 |
Seaport |
city Novorossisk |
360 |