Project name |
Construction of plant for production of concrete products by vibropressing |
Location of the project |
Novokubanskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Shop for the manufacture of concrete block-making products: curb and sidewalk stone, paving tiles and wall unit, the production of granules and powder of natural stone |
Project capacity |
Block wall - 22.36 m 3 / year; Pavement tile - 15.67 m 3 / year |
Financial estimation of the project |
Total cost of the project, mln rubles |
29,8 mln. Rub |
Investment capacity, mln rubles |
29,8 mln. Rub |
Conditions of investor participation |
Direct investments |
Payback period |
3,7 years |
Land characteristics |
Location |
Krasnodar region, Novokubanskoe town, city Novokubansk street Innovators, 1 / 3 |
Land plot area (m2) |
10000 sq. m. |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
10 kV 35/10 kV «Prochnookopskaya» |
100 |
Gas supply |
100 mm |
150 |
Water supply |
100 mm |
120 |
Sewerage system |
Local treatment facilities |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Novokubansk |
5 km |
Center of federal subject |
The city of Krasnodar |
205 km |
Highway (regional, federal significance) |
FAD «Kavkaz» |
11 km |
Roads of local significance |
Novokubansk city - the city of Armavir |
0,5 km |
Nearest railway station |
Station Kuban |
9 km |
Nearest railway lines |
Station Kuban |
9 km |
Airport |
The city of Stavropol |
145 km |
Seaport |
City of Tuapse |
285 km |