Project name |
Building of house-building combine |
Location of the project |
Novokubanskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
The construction of the building houses works of 7,2 thousand m2 of products per year: - two-layer sandwich panels; - I-beam; - Building one- and many - floor residential buildings «Turnkey» |
Project capacity |
The construction of the building houses works of 7,2 thousand m2 of products per year |
Financial estimation of the project |
Total cost of the project, mln rubles |
207,5 mln. Rub |
Investment capacity, mln rubles |
207,5 mln. Rub |
Conditions of investor participation |
Direct investments, borrowed funds |
Payback period |
4,5 years |
Land characteristics |
Location |
Krasnodar region, Novokubansky area h.Gluboky, 450 meters south of the residential development |
Land plot area (m2) |
200 000 sq. m. |
Ground categories |
Agricultural land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
10 kV high voltage, VA-0, 4 kV. RTP 35/10 4000kVA |
along a stretch of 600 m |
Gas supply |
100 mm average pressure |
50 m average pressure |
Water supply |
100 mm |
450 m from the intake station p.Gluboky |
Sewerage system |
Local treatment facilities |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Novokubansk |
25 km |
Center of federal subject |
The city of Krasnodar |
225 km |
Highway (regional, federal significance) |
FAD «Kavkaz» |
5 km |
Roads of local significance |
Village of Glubokij – the city of Armavir |
0,5 km |
Nearest railway station |
The city of Armavir |
11 km |
Nearest railway lines |
The city of Armavir |
11 km |
Airport |
The city of Stavropol |
135 km |
Seaport |
City of Tuapse |
277 km |