Building of house-building combine

Project name Building of house-building combine
Location of the project Novokubanskiy district
Industry classification Production of construction materials
Basic information about the project
Project essence The construction of the building houses works of 7,2 thousand m2 of products per year: - two-layer sandwich panels; - I-beam; - Building one- and many - floor residential buildings «Turnkey»
Project capacity The construction of the building houses works of 7,2 thousand m2 of products per year
Financial estimation of the project
Total cost of the project, mln rubles 207,5 mln. Rub
Investment capacity, mln rubles 207,5 mln. Rub
Conditions of investor participation Direct investments, borrowed funds
Payback period 4,5 years
Land characteristics
Location Krasnodar region, Novokubansky area h.Gluboky, 450 meters south of the residential development
Land plot area (m2) 200 000 sq. m.
Ground categories Agricultural land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 10 kV high voltage, VA-0, 4 kV. RTP 35/10 4000kVA along a stretch of 600 m
Gas supply 100 mm average pressure 50 m average pressure
Water supply 100 mm 450 m from the intake station p.Gluboky
Sewerage system Local treatment facilities -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center The city of Novokubansk 25 km
Center of federal subject The city of Krasnodar 225 km
Highway (regional, federal significance) FAD «Kavkaz» 5 km
Roads of local significance Village of Glubokij – the city of Armavir 0,5 km
Nearest railway station The city of Armavir 11 km
Nearest railway lines The city of Armavir 11 km
Airport The city of Stavropol 135 km
Seaport City of Tuapse 277 km