Project name |
Construction of a plant producing aero Crete in Beloglinsky District |
Location of the project |
Beloglinskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
It is planned that the factory will make autoclave gas concrete. Application of gas concrete promotes acceleration of rates of building, simplification of manufacture of works, reduction of loading by the base, reduction of bearing designs at erection of high-rise buildings and constructions. |
Project capacity |
Taking into account capacity of planned factory, the production technology, it is planned to carry out release of blocks from gas concrete in volume 12000 sq.m. |
Financial estimation of the project |
Total cost of the project, mln rubles |
44,5 |
Investment capacity, mln rubles |
44,5 |
Conditions of investor participation |
Direct investments |
Payback period |
6,75 years |
Land characteristics |
Location |
Crossroads of Proletarskaya Street and Tikhiy Lane, Belaya Glina village, Krasnodar region |
Land plot area (m2) |
15000 |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Placing perspective transformation station and high electric line 110 KV is planned: 110 KV “Severnaya” |
500 |
Gas supply |
GDS |
1500 |
Water supply |
D=300 mm |
1500 |
Sewerage system |
It is absent |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belaya Glina village |
0 |
Center of federal subject |
Krasnodar city |
240 |
Highway (regional, federal significance) |
Tikhoretsk - Salsk |
2 |
Roads of local significance |
rural road |
500 |
Nearest railway station |
Beloglinskaya |
1,8 |
Nearest railway lines |
Single lane |
1,8 |
Airport |
Krasnodar city |
240 |
Seaport |
Novorossiysk city |
385 |