Project name |
Construction of a plant for production of thermal insulation materials |
Location of the project |
Viselkovskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Production of thermal insulation materials to be used in construction works in Krasnodar Region Reducing the housing net cost, setting up more job positions, increasing tax funds |
Project capacity |
162,2 mln. rub |
Financial estimation of the project |
Total cost of the project, mln rubles |
150mln. rub |
Investment capacity, mln rubles |
150mln. rub |
Conditions of investor participation |
Direct investments |
Basic indicators of investment project economic efficiency |
Simple payback time |
3,7 years |
Land characteristics |
Location |
Gazyr settlement., Vyselkovsky District, Krasnodar Region |
Land plot area (m2) |
60000m2 |
Ground categories |
Lands of populated localities |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Attached power 1 MWt |
1750 |
Gas supply |
porting to the gasmain of high pressure laid in Gazyr settlement |
1400 |
Water supply |
D100 mm |
1500 |
Sewerage system |
|
Isolated septic to be built within the plot |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Vyselky village |
30 |
Center of federal subject |
Town of Krasnodar |
125 |
Highway (regional, federal significance) |
The “Don” federal motorway |
5 |
Roads of local significance |
|
0,7 |
Nearest railway station |
|
15 |
Nearest railway lines |
|
12 |
Airport |
Town of Krasnodar |
150 |
Seaport |
Town of Novorossiysk |
270 |