̉he enterprise on extraction and processing of sand and gravel

Project name ̉he enterprise on extraction and processing of sand and gravel
Location of the project Kurganinskiy district
Industry classification Production of construction materials
Basic information about the project
Project essence Production of all-in aggregate: crushed stone, gravel and sand. Structure construction, crushing and screening equipment buying and assembly, quarry and motor transport technique buying, quarry opening are planned
Project capacity Enterprise production volume with the 50% use is 400 000 cub.m. a year, among them crushed stone - 200 000 cub.m., elimination - 40 000 cub.m., gravel - 40 000 cub.m., sand – 120 000 cub.m.
Financial estimation of the project
Total cost of the project, mln rubles 80,630 mln.rub.
Investment capacity, mln rubles 80,630 mln.rub.
Conditions of investor participation Direct investments
Payback period 4,2 year
Land characteristics
Location Krasnodar region, north-east outskirts of Kurganinsky district, Uzhniy settlement
Land plot area (m2) 408635 sq.m.
Ground categories Agricultural purpose ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL-10 kV Mx-3, maximal volume is 210 kV 510
Gas supply Not required -
Water supply Construction of tubular well On the land plot
Sewerage system Construction of local purification plants On the land plot
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 18
Center of federal subject Krasnodar city 160
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 6,5
Roads of local significance Naberezhnaya street 0,5
Nearest railway station Kurgannaya station 4
Nearest railway lines Armavir-Tuapse 10
Airport Krasnodar city 163
Seaport Tuapse city 329