Project name |
̉he enterprise on extraction and processing of sand and gravel |
Location of the project |
Kurganinskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Production of all-in aggregate: crushed stone, gravel and sand. Structure construction, crushing and screening equipment buying and assembly, quarry and motor transport technique buying, quarry opening are planned |
Project capacity |
Enterprise production volume with the 50% use is 400 000 cub.m. a year, among them crushed stone - 200 000 cub.m., elimination - 40 000 cub.m., gravel - 40 000 cub.m., sand – 120 000 cub.m. |
Financial estimation of the project |
Total cost of the project, mln rubles |
80,630 mln.rub. |
Investment capacity, mln rubles |
80,630 mln.rub. |
Conditions of investor participation |
Direct investments |
Payback period |
4,2 year |
Land characteristics |
Location |
Krasnodar region, north-east outskirts of Kurganinsky district, Uzhniy settlement |
Land plot area (m2) |
408635 sq.m. |
Ground categories |
Agricultural purpose ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10 kV Mx-3, maximal volume is 210 kV |
510 |
Gas supply |
Not required |
- |
Water supply |
Construction of tubular well |
On the land plot |
Sewerage system |
Construction of local purification plants |
On the land plot |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
18 |
Center of federal subject |
Krasnodar city |
160 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
6,5 |
Roads of local significance |
Naberezhnaya street |
0,5 |
Nearest railway station |
Kurgannaya station |
4 |
Nearest railway lines |
Armavir-Tuapse |
10 |
Airport |
Krasnodar city |
163 |
Seaport |
Tuapse city |
329 |