Project name |
Building of the factory for production steam-cured gas concrete |
Location of the project |
Gulkevichskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Construction of the factory for production blocks and detached element (for the stairs, staircase, floor slab, pitch of roof) out of the aero Crete.. The Material of the production consist of the mix natural’s components. Thanks to harden to steam become the crystal structur. |
Project capacity |
annual production volume - 346 thousand cubic meters |
Financial estimation of the project |
Total cost of the project, mln rubles |
524.2 |
Investment capacity, mln rubles |
524.2 |
Conditions of investor participation |
Direct investments |
Payback period |
2.1 yers |
Land characteristics |
Location |
Gulkevichi district, s. Girei, 500 m to the west from the railroad along the road s Gulkevichi – Novoukrainskoe - Scgewchenko, |
Land plot area (m2) |
83340 Sq. m |
Ground categories |
the earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
The Electric station 35 kW |
2150 |
Gas supply |
Gas pipe line height pressure D200 mm |
2250 |
Water supply |
Building of an artesian chink is planned |
In site territory |
Sewerage system |
D 200 mm |
1500 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Gulkevichi city |
It is located on a city territory |
Center of federal subject |
Krasnodar city |
3 |
Highway (regional, federal significance) |
̀29 Rostow-Mahachkala |
165 |
Roads of local significance |
Gulkevichi-Kropotkin |
7 |
Nearest railway station |
station Gulkevichi |
0,02 |
Nearest railway lines |
station Gulkevichi |
0,5 |
Airport |
Krasnodar city |
165 |
Seaport |
Novorossisk city |
314 |