Building of the factory for production steam-cured gas concrete

Project name Building of the factory for production steam-cured gas concrete
Location of the project Gulkevichskiy district
Industry classification Production of construction materials
Basic information about the project
Project essence Construction of the factory for production blocks and detached element (for the stairs, staircase, floor slab, pitch of roof) out of the aero Crete.. The Material of the production consist of the mix natural’s components. Thanks to harden to steam become the crystal structur.
Project capacity annual production volume - 346 thousand cubic meters
Financial estimation of the project
Total cost of the project, mln rubles 524.2
Investment capacity, mln rubles 524.2
Conditions of investor participation Direct investments
Payback period 2.1 yers
Land characteristics
Location Gulkevichi district, s. Girei, 500 m to the west from the railroad along the road s Gulkevichi – Novoukrainskoe - Scgewchenko,
Land plot area (m2) 83340 Sq. m
Ground categories the earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply The Electric station 35 kW 2150
Gas supply Gas pipe line height pressure D200 mm 2250
Water supply Building of an artesian chink is planned In site territory
Sewerage system D 200 mm 1500
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Gulkevichi city It is located on a city territory
Center of federal subject Krasnodar city 3
Highway (regional, federal significance) ̀29 Rostow-Mahachkala 165
Roads of local significance Gulkevichi-Kropotkin 7
Nearest railway station station Gulkevichi 0,02
Nearest railway lines station Gulkevichi 0,5
Airport Krasnodar city 165
Seaport Novorossisk city 314