Project name |
Construction of milk processing and milk production output factory |
Location of the project |
Kurganinskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
Project includes the construction of objects: storehouse for dried milk, milk recovery shop, material storehouse, production shop, central detergent station, ferment preparation room, laboratory, ready production storehouse, service and everyday rooms |
Project capacity |
Factory output is 50 tonnes. Introduced productive facilities let produce: 1 050 tonnes of pasteurized milk, 100 tonnes of sour creme, 350 tonnes of milk production, 700 tones of butter, 2 300 tonnes of dried milk a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
168,106 mln.rub |
Investment capacity, mln rubles |
168,106 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
4,2 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, Lugovaya street,23 |
Land plot area (m2) |
30 000 sq.m |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10 kilovolt |
20,0 |
Gas supply |
From the operating underground high pressure gas pipeline |
850,0 |
Water supply |
From the operating water supply system, steel pipe, diameter 100 mm |
800,0 |
Sewerage system |
In the operating sewerage system, pipe diameter 200 mm |
830,0 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
170 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,8 |
Roads of local significance |
Lugovaya street |
0,04 |
Nearest railway station |
Kurgannaya station |
2,8 |
Nearest railway lines |
Armavir-Tuapse |
0,430 |
Airport |
Krasnodar city |
173 |
Seaport |
Tuapse city |
350 |