Project name |
Factory of dry building mixes |
Location of the project |
Krimskiy district |
Industry classification |
Production of construction materials |
Basic information about the project |
Project essence |
The factory on manufacture of dry building mixes differs reliability, simplicity in operation, and time of transition from one kind of let out production on another makes about 1 hour. It allows to lower considerably production cost price, and high profitability of the equipment provides its profitability. Within the limits of project realisation it is planned to make glue for a tile, bulk floors, mixes for internal and external works. |
Project capacity |
The factory from second year of realisation of the project will work on capacity in 51 % is 12 700 tons of dry building mixes a year, on the fifth year of 100 % use of capacity of factory is 25 000 tons of dry building mixes a year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
24,989 million rbl. |
Investment capacity, mln rubles |
24,989 million rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
3,2 years |
Land characteristics |
Location |
The Krymsk area, Troitsk rural settlement, village Troitsk, section 19, a contour 30 |
Land plot area (m2) |
77 000 sq.m. |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
6 MW |
The electrical supply is possible from PS 110/10/6 kV \\\"the Troitsk water fence\\\" after performance of works under the individual project of reconstruction PS \\\"Troitsk water fence\\\" with installation of new transformer T-3 (110/10 kV) capaci |
Gas supply |
Loading to 0,3mln.m3/year, a gas pipeline is under construction Dm-150mm |
Mogukorovo - 1000 m |
Water supply |
The volume of consumption 30 m3/days Is a waterpipe of Du-100mm, a pressure 2-4 atm. |
Pump station of 2nd lifting TGV of branch of Open Company \\\"Ugvodokanal\\\"-2000 m |
Sewerage system |
No, the device own the independent water drain |
No |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The city of Krymsk |
29 |
Center of federal subject |
The city of Krasnodar |
75 |
Highway (regional, federal significance) |
Kymsk - Slavyansk - on Kuban |
4 |
Roads of local significance |
Krymsk, Slavyansk |
32, 14 |
Nearest railway station |
Nvorssijsk - Krasnodar |
3 |
Nearest railway lines |
Krasnodar |
75 |
Airport |
Krasnodar |
75 |
Seaport |
Novorossijsk |
85 |