Project name |
Factory for producing leather products |
Location of the project |
Krylovsky district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
The main direction will processing wet-salted hides of cattle till stage cordivan semifinished products “Wet blue” |
Project purpose |
Issue cordivan semifinished products “Wet blue” from wet-salted hides of cattle easy, middle and hard weight wet-salted conserving method by Italy technology according with European standarts , |
Project capacity |
Sale semifinished «Wet blue» - 115 000 units in a year; Processing customer-owned raw materials – 75 000 units in a year. |
Consumer market description |
Potential buyers are Russian and foreign enterprises of light industry |
Object construction term |
1 year |
Competitive advantage |
«Wet blue» is raw material for producing different types of leather that used during sewing dresses, furniture and footwear. |
Resource availability for project realization |
Provide of energy carrier |
Planned volume of resource consumption (annual) |
Planned volume of electricity consumption (annual), MW |
0,685 |
Planned volume of gas consumption (annual), million cubic meters |
0,241 |
Planned volume of water consumption (annual), million cubic meters |
0,380 |
Degree of project development |
Created business plan, formed ground area, investor searching |
Financial estimation of the project |
Total cost of the project, mln rubles |
31,0 |
Own resources, million rubles |
- |
Means of regional (municipal) budget, million rubles |
- |
Previously involved means, million rubles |
- |
Investment capacity, mln rubles |
31,0 |
Conditions of investor participation |
Direct investment |
Form of investments return |
monetary |
Payback period |
2 years |
Basic indicators of investment project economic efficiency |
Net present value (NPV) |
55,714 mln.rur. |
Simple payback time |
2 years |
Discounted payback period |
5 years |
Internal rate of return (IRR) |
30 % |
Productivity index (PI) |
1,51 |
Income |
60,7 mln.rur. |
Social efficiency of investment project |
Number of workplaces |
39 |
Salary average level |
8346 RUR |
Budgetary efficiency of investment project |
Mid-annual tax payments, million rubles |
17,2 |
which includes into consolidated budget of the krai, million rubles |
8,5 |
Land characteristics |
Location |
Krylovskaya district, Kugoeiskaya vill, Stalingradskaya street, industrial area |
Cadastral number of quarter |
23:24:0204311 |
Land plot area (m2) |
10 000 |
Ground categories |
Lands of settlements |
Kind of permitted use |
Construction enterprise for producing leather |
Actual use |
Free area |
Availability of buildings, structures, constructions |
Doesn’t exist |
Authorizations, urban planning documentation |
Scheme territorial planning municipality Krylovskaya district (in development stage) prepared by OJSC “Institute of territorial development of Krasnodar region” |
Information on proprietor (franchisor) of ground area |
Proprietor |
state ownership |
Franchisor |
Municipality Kugoeyskaya village |
Right kind |
state ownership |
Data on encumbrances |
Kind of encumbrances, restrictions |
no |
Area of encumbrances |
no |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
It is necessary construction substation 35/10 kV or 110/10 kV: electro line 35 kV electro line 110kV |
460 540 |
Gas supply |
high pressure supply lined = 219 mm, 6 bar., |
1335 |
Water supply |
Construction artesian well |
In board of land area |
Sewerage system |
Construction of waterproof sludge digestion plant |
In board of land area |
Telephone penetration |
- |
- |
Cost of maintenance of ground area with engineering infrastructure (million rubles) |
rough: Electric supply: 0,195 Gas supply: polyethylene – 0,280 Metallic – 0,037 Water supply: 0,080 telephonization: 0,060 Cost of road: 0,234 |
Additional information on ground area |
Special conditions |
relief is quite Collapsing soil of the I type Level of subsoil waters – 6-7 meters domination wind direction: East, North-East; seismicity: until 6 points. |
Cost of rent/repayment of ground area (million rubles) |
0,452 / 1,9 |
Notes |
Population of Kugoeiskaya – 2470 persons. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Krylovskaya vill. |
28 |
Center of federal subject |
Krasnodar city |
208 |
Highway (regional, federal significance) |
M4 |
13 |
Roads of local significance |
- |
0,15 |
Nearest railway station |
Railway station Krylovskaya |
40 |
Nearest railway lines |
Railway station Krylovskaya |
40 |
Airport |
Rostov-on-Don |
185 |
Seaport |
Eisk |
158 |
Contact information |
Information on project proponent |
no |
Information on applicant |
Administration of municipality Krylovskaya district 352080, Krylovskaya village, Ordzhonikidze st. 43, tel. /fax(86161) 31-4-84/31-3-73 ; official web-site: www.krilovskaya.ucoz.ru, Ubiyko Sergey Ivanovich – Head of municipality Krylovskaya district, |