Project name |
Location of an integrated covered market for sale of foodstuffs and manufactured products |
Location of the project |
Krasnoarmejskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of modern the draft public business infrastructure |
Project capacity |
After the completion of the phase of implementing in the first year of work planned sales stalls the 350 cheques with average cheque 410 rubles, the second and third years 10 400 cheques with average cheque 480 rubles |
Financial estimation of the project |
Total cost of the project, mln rubles |
3,5 mln. rub. |
Investment capacity, mln rubles |
3,5 mln. rub. |
Conditions of investor participation |
Direct investments |
Payback period |
4,2 years |
Land characteristics |
Location |
Protichka farm, 40 let Pobedy Street |
Land plot area (m2) |
2000 sq.m. |
Ground categories |
Land settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Existing power netwarks Air lines 10 kV “Poltavskaya” |
25 |
Gas supply |
Existing street gas supply netwarks |
15 |
Water supply |
O 90 mm |
25 |
Sewerage system |
Watertight stinking fund |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Poltavskaya village |
11 |
Center of federal subject |
Krasnodar |
76 |
Highway (regional, federal significance) |
Temriuk-Krasnodar-Kropotkin |
20 |
Roads of local significance |
Novomyshastovskaya village |
0.02 |
Nearest railway station |
Poltavskaya station |
7.5 |
Nearest railway lines |
Poltavskaya station |
7.5 |
Airport |
Krasnodar |
76 |
Seaport |
Novorossiysk |
91 |