Project name |
Shopping centre building |
Location of the project |
Labinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Building of the new trading complex including realisation of the goods for the house and repair and realisation of articles of food |
Project capacity |
80 million rbl. a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
22,734 million rbl |
Investment capacity, mln rubles |
22,734 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
3.0 years |
Land characteristics |
Location |
G.Labinsk, along a motorway northern entrance by to Labinsk, 1 êì+490 at the left |
Land plot area (m2) |
8000,0 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 0,4 kw |
300 |
Gas supply |
100 mm |
500 |
Water supply |
Projected tubular well |
In borders of a considered plot |
Sewerage system |
The projected water-proof has removed |
In borders of a considered plot |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
- |
Center of federal subject |
Krasnodar city |
200 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
0,05 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
0,01 |
Nearest railway station |
Station Labinsk |
4 |
Nearest railway lines |
|
3 |
Airport |
Krasnodar city |
200 |
Seaport |
Tuapse city |
180 |