Construction of a roadside complex in village Razdolnoe

Project name Construction of a roadside complex in village Razdolnoe
Location of the project Kushchevskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Within the limits of the developed project construction of a roadside complex on the area 2100 m2 is provided. The building of a complex includes following basic kinds of premises: Hotel - 200 m2., Item of servicing and car wash 60 m2., Shop of autospare parts 60 m2., Cafe on 30 places a total area 130 m2.; Chemist's item; The market of agricultural production
Project capacity The developed complex is directed on satisfaction of need of drivers and passengers in the qualitative and civilized rest during long crossings.
Financial estimation of the project
Total cost of the project, mln rubles 14,360
Investment capacity, mln rubles 14,360
Conditions of investor participation Direct investments
Payback period 3,5 years
Land characteristics
Location Krasnodar territory, municipal formation area Kushchevsky, village Razdolnoe between street Severnaya and street Krasnaya
Land plot area (m2) 2100
Ground categories The Earth the industries, power, transport, communication, etc.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply KTP R-7-812 100
Gas supply 250mm 500
Water supply 100mm 400
Sewerage system Construction of local clearing constructions Construction of local clearing constructions
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kuschevskaya 17,0
Center of federal subject Krasnodar 237,0
Highway (regional, federal significance) Federal motorway Ì-4 "Don" 0,075
Roads of local significance «Kuschevskaya-Starominskaya» 22,0
Nearest railway station Stepnaya 15,0
Nearest railway lines 15,0
Airport Rostov-on-Don 60,0
Seaport Eysk 140,0