Construction of servicing station on 3 posts including car wash

Project name Construction of servicing station on 3 posts including car wash
Location of the project Kalininskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence It’s suppose the construction of servicing station on three posts including car wash. It is plan to render services of maintenance of technical condition and operating features of vehicles in the complex.
Project capacity Annual profit is 10 722 thousand rub.
Financial estimation of the project
Total cost of the project, mln rubles 5,841 mln. Rub.
Investment capacity, mln rubles 5,841 mln. Rub.
Conditions of investor participation Direct investments, loan funds, other
Payback period 2.7 years
Land characteristics
Location Plot locates south-eastwards from stanitsa Starovelichkovskaya, along highway Kalininskaya-Novotitarovskaya 12+094 km (from right side)
Land plot area (m2) 1400 square meters
Ground categories Settlement land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Substation 35/10 kV “Starovelichkovskaya”overhead power line -10 kV SV-5, construction of substation 10/04 kW 50
Gas supply 325 mm 30
Water supply 100 mm, water pressure 1,2 atm. 300
Sewerage system - Projected septic
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Stanitsa Kalininskaya 10
Center of federal subject Krasnodar 60
Highway (regional, federal significance) Kalininskaya-Novotitarovskaya 0,1
Roads of local significance Gorodskaya street 0,1
Nearest railway station Station “Velichkovka” 7,0
Nearest railway lines Stanitsa Starovelichkovskaya 7,0
Airport Krasnodar 65
Seaport Novorossiysk 140