Shopping pavilion

Project name Shopping pavilion
Location of the project Tbilisskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Construction of shopping pavilion. It is supposed trading of food and tobacco products
Project capacity Building square 95 m?
Financial estimation of the project
Total cost of the project, mln rubles 2,7 mln. rbl.
Investment capacity, mln rubles 2,7 mln. rbl.
Conditions of investor participation Direct investments
Payback period 3,8 year
Land characteristics
Location Farm Severin, Mira street
Land plot area (m2) 100 sq.m.
Ground categories Settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 35/10 kw 50
Gas supply no necessary -
Water supply from existing water pipe d-110mm., free pressure in net 1,5 atm. 25
Sewerage system local -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village 1,5
Center of federal subject Krasnodar city 115
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 7
Roads of local significance existing motorway with asphaltic concrete pavement 0,02
Nearest railway station station of Grechishkino 3,77
Nearest railway lines Krasnodar-Kropotkin 3,6
Airport airport of Krasnodar 105
Seaport port of Novorossiysk 285