Project name |
Construction of the service station cars on 1 post |
Location of the project |
Kavkazskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Technical service of automobile |
Project capacity |
2400 things |
Financial estimation of the project |
Total cost of the project, mln rubles |
1,394 |
Investment capacity, mln rubles |
1,394 |
Conditions of investor participation |
Direct investments |
Payback period |
3,2 years |
Land characteristics |
Location |
Kavkazsky district, Mirskoe village settlement Vozrozhdenie village St. Novaya 1 |
Land plot area (m2) |
2000 |
Ground categories |
Grounds of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Transformer substantion 330/110/0,6 kW «Kropotkin» |
3000 |
Gas supply |
- |
- |
Water supply |
Water pipe D=150 mm |
50 |
Sewerage system |
Local constructions |
4 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kropotkin town |
25 |
Center of federal subject |
Krasnodar |
160 |
Highway (regional, federal significance) |
Tmruyk-Stavropol FAD "Caucasus" |
23 8 |
Roads of local significance |
Oktyabrskaya street |
0,5 |
Nearest railway station |
Mirskaya village |
8 |
Nearest railway lines |
Mirskaya village |
8 |
Airport |
Airport Armavir |
160 |
Seaport |
Novorossiysk seaport |
320 |