Construction of car service center

Project name Construction of car service center
Location of the project Krylovsky district
Industry classification Consumer sphere
Basic information about the project
Project essence By this project is estimated construction of car service center that include repair zone, and zone of technical service, trade zone and bistro
Project purpose Creating service center for meeting requirements of travelers, tourists, transit passengers and drivers that move across highway “Don” and local inhabitance
Project capacity servicing deport (1500 sqr.m) , selling area (200 sqr.m), restaurant (243 sqr.m 60 places on 15 tables)
Consumer market description Potential consumer will travelers by bus, tourists by car, drivers and passengers on tracks, guests of district.
Object construction term 1 year
Competitive advantage Concentration the most popular type of service for transit people in one complex
Resource availability for project realization Raw material: Within project realization, for for high-grade financing service center is necessary to provide delivery of spare parts according volume o food that produce in our district. Energy carrier: necessity system water supply, water drain,
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MW 0,5
Planned volume of gas consumption (annual), million cubic meters 0,4
Planned volume of water consumption (annual), million cubic meters 0,2
Degree of project development Created business plan, formed ground area, investor searching
Financial estimation of the project
Total cost of the project, mln rubles 20
Own resources, million rubles -
Means of regional (municipal) budget, million rubles 0
Previously involved means, million rubles 0
Investment capacity, mln rubles 20
Conditions of investor participation Direct investment
Form of investments return monetary
Payback period 5 years
Basic indicators of investment project economic efficiency
Net present value (NPV) 10,6 mln.rur
Simple payback time 3,9 years
Discounted payback period 4,1 years
Internal rate of return (IRR) 43 % annual
Productivity index (PI) 112,3 %
Income 51,2 mln.rur
Social efficiency of investment project
Number of workplaces 26
Salary average level 9 675
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles 2,9
which includes into consolidated budget of the krai, million rubles 0,6
Land characteristics
Location Location service center is planned in Oktyabrskaya, highway “Don”+300 to the left
Cadastral number of quarter 23:14:05 15 000
Land plot area (m2) required area land lot is 8 044 sqr.mt
Ground categories Lands of settlements
Kind of permitted use Land lot is used for construction service centre
Actual use Non-agriculture use
Availability of buildings, structures, constructions Free of building
Authorizations, urban planning documentation General plan of Oktyabrskaya settlement approved and put into effect with reference to territory by decision Council Municipality Krylovskaya district Krasnodar region 27.06.2007 ¹405 and prepared by OJSC “Institute of territorial development of Kras
Information on proprietor (franchisor) of ground area
Proprietor state ownership
Franchisor Municipality Krylovskaya district
Right kind Not registered
Data on encumbrances
Kind of encumbrances, restrictions No
Area of encumbrances No
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 10 kWt until 500 ́
Gas supply diam. 200 mm until 400 ́
Water supply diam. 100 mm until 500 ́
Sewerage system local sewage disposal plant
Telephone penetration until 400 ́
Cost of maintenance of ground area with engineering infrastructure (million rubles) 3,8
Additional information on ground area
Special conditions Collapsing soil of the I type
Cost of rent/repayment of ground area (million rubles) 151,1 thrs.RUR./ 875,2 thrs.RUR.
Notes no
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Krylovskaya vill. 14
Center of federal subject Krasnodar city 170
Highway (regional, federal significance) M4 2
Roads of local significance Industrialnaya st 0,5
Nearest railway station Railway station Krylovskaya 1.5
Nearest railway lines Railway station Krylovskaya 0,5
Airport Rostov-on-Don 120
Seaport Eisk 150
Contact information
Information on project proponent íạ̊
Information on applicant Administration of municipality Krylovskaya district 352080, Krylovskaya village, Ordzhonikidze st. 43, tel. /fax(86161) 31-4-84/31-3-73 ; e-mail: admkrylovskaya@mail.ru official web-site: www.krilovskaya.ucoz.ru, Ubiyko Sergey Ivanovich – Head