Construction of carwash (2 posts) and Car Service Station (3 posts

Project name Construction of carwash (2 posts) and Car Service Station (3 posts
Location of the project Kavkazskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Construction of carwash (2 posts) and Car Service Station (3 posts) using modern equipment
Project capacity 5,7 million. rur./year
Financial estimation of the project
Total cost of the project, mln rubles 2,621
Investment capacity, mln rubles 2,621
Conditions of investor participation Direct investments
Payback period 4,0 years
Land characteristics
Location 336 Krasnaya street, st. Kazanskaya, Kavkazskiy district.
Land plot area (m2) 975
Ground categories Settlement lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply HV Line – 10 kV feeder “K - 3” “Kazanskaya” substation 110/35/10 kV 2900 m
Gas supply N / A -
Water supply Asbestos-cement water supply system, diameter 150 mm on Krasnaya street.(st. Kazanskaya) 200 m
Sewerage system Construction of local sewage facilities is required -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kropotkin 14,7
Center of federal subject Krasnodar 150
Highway (regional, federal significance) Federal highway “Kavkaz” Motor road of regional significance “Stavropol – Temryuk – Krasnodar” 11,7
Roads of local significance Krasnaya street (st. Kazanskaya) – àâòîäîðîãà ñ àñôàëüòîâûì ïîêðûòèåì 0,05
Nearest railway station “Milovanovo” station 4,0
Nearest railway lines “Russian Railways” ÎÀÎ 4,0
Airport Krasnodar 150
Seaport Novorossiysk 280