Construction parking for heavy hauler

Project name Construction parking for heavy hauler
Location of the project Krylovsky district
Industry classification Consumer sphere
Basic information about the project
Project essence Project unit service line for nutrition and trade
Project purpose Rendering of services supervised parking, ìàãàçèíà, mounting, personal services.
Project capacity 35 919 thrs. RUR per year
Consumer market description The main consumer will inhabitant and guests of region
Object construction term 1 years
Competitive advantage High quality and acceptable prices
Resource availability for project realization Provided of energy carrier
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MW 0,265
Planned volume of gas consumption (annual), million cubic meters 0,135
Planned volume of water consumption (annual), million cubic meters 0,021
Degree of project development Created business plan, formed ground area, investor searching
Financial estimation of the project
Total cost of the project, mln rubles 22
Own resources, million rubles -
Means of regional (municipal) budget, million rubles -
Previously involved means, million rubles -
Investment capacity, mln rubles 22
Conditions of investor participation Direct investment
Form of investments return monetary
Payback period 2 year
Basic indicators of investment project economic efficiency
Net present value (NPV) 26 293 thrs. RUR
Simple payback time 2 years
Discounted payback period 6 years
Internal rate of return (IRR) 29%
Productivity index (PI) 1,46
Income 30 440 thrs.RUR per year
Social efficiency of investment project
Number of workplaces 19
Salary average level 7789 RUR
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles 9,1
which includes into consolidated budget of the krai, million rubles 4,5
Land characteristics
Location Location is planned in Oktyabrskaya, highway “Don”1178+150
Cadastral number of quarter 23:14:05 01 003
Land plot area (m2) 8 000
Ground categories Land of settlements
Kind of permitted use For construction roadside service object
Actual use Doesn’t use
Availability of buildings, structures, constructions Doesn’t exist
Authorizations, urban planning documentation General plan combine with lay-out project center roadside servise on highway “Don” in Krylovskaya district Krasnodar region(decision of Head of municipality Krylovskaya district 30.11.2005 ¹ 726)
Information on proprietor (franchisor) of ground area
Proprietor state ownership
Franchisor Municipality Krylovskaya district
Right kind Not registered
Data on encumbrances
Kind of encumbrances, restrictions No
Area of encumbrances No
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply It is necessary construction substation 110/10Kv with two power transformer with capacity 20 MVA 45
Gas supply high pressure supply lined = 225 mm, 3 atm., 1750
Water supply Construction artesian well In site borders
Sewerage system Construction local sewage disposal plant In site borders
Telephone penetration 2400
Cost of maintenance of ground area with engineering infrastructure (million rubles) 10.7
Additional information on ground area
Special conditions relief is quite Collapsing soil of the I type Level of subsoil waters – 6-7 meters domination wind direction: East, North-East; seismicity: until 6 points.
Cost of rent/repayment of ground area (million rubles) 0,045/0,446.
Notes The population st-tsy October – 13100 persons
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Krylovskaya vill. 11
Center of federal subject Krasnodar city 180
Highway (regional, federal significance) M4 -
Roads of local significance - 0,03
Nearest railway station Railway station Krylovskaya 1,1
Nearest railway lines Railway station Krylovskaya 1,1
Airport Rostov-on-Don 185
Seaport Eisk 130