Project name |
Construction of parking lot for light motor and commercial vehicles |
Location of the project |
Kavkazskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of parking lot for light motor and commercial vehicles with maximum capacity of 50 vehicle spaces in Kropotkin |
Project capacity |
1050 m2 |
Financial estimation of the project |
Total cost of the project, mln rubles |
2,7 |
Investment capacity, mln rubles |
2,7 |
Conditions of investor participation |
Direct investments |
Payback period |
3,4 years |
Land characteristics |
Location |
97 Shosseinaya street, Kropotkin, Kavkazskiy district |
Land plot area (m2) |
3543 |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
High Voltage Line – 6kV, feeder No1 within territory of production facilities on 95/1 Shosseynaya street |
350 |
Gas supply |
N/A |
- |
Water supply |
Steel water supply pipeline D – 100 mm on Shosseynaya Street |
50 m |
Sewerage system |
Construction of local sewage facility is required |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kropotkin |
3,55 |
Center of federal subject |
Krasnodar |
140 |
Highway (regional, federal significance) |
Federal highway “Kavkaz” Motor road of regional significance “Temryuk – Krasnodar - Stavropol” |
0,5 4,3 |
Roads of local significance |
Shosseynaya street is a highway of federal significance “Kavkaz” Motor road Kropotkin - Tbilisskaya |
0,5 1,2 |
Nearest railway station |
“Kavkazskaya” Rail station |
3,3 |
Nearest railway lines |
“Russian railways” ÎŔÎ |
3,3 |
Airport |
Krasnodar “Pashkovskiy” |
140 |
Seaport |
Novorossiysk |
265 |