Project name |
Construction of sand-blasting plant |
Location of the project |
Korenovskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Planned to build sandblaster shop in the Korenovsky district |
Project capacity |
Annual production of services - up to 70,000 finished parts per year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
12,0 mln. rbl. |
Investment capacity, mln rubles |
12,0 mln. rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
3,2 years |
Land characteristics |
Location |
Krasnodar region, Korenovsky district, Novoberezanskoe rural settlement, x. Proletarskiy |
Land plot area (m2) |
7000 m2 |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
connection point - from power lines on the street. Tsentralnaya |
100 |
Gas supply |
expansion of the system timing n. Novoberezanskogo, the point of connection from an existing pipeline on the Tsentralnoy street |
400 |
Water supply |
connection point - from the water passing along the street. Central, the volume of water consumption - 2.0 m3/day |
500 |
Sewerage system |
central pressurized sewer network, wastewater volume 2.0 m3/day, on the street. Tsentralnaya |
0,6 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Korenovsk city |
35 |
Center of federal subject |
Krasnodar city |
95 |
Highway (regional, federal significance) |
M4 Don |
19 |
Roads of local significance |
Tsentralnaya street |
0,3 |
Nearest railway station |
Korenovsk city |
37 |
Nearest railway lines |
|
22 |
Airport |
Krasnodar |
104 |
Seaport |
Novorossiysk |
340 |