Construction of sand-blasting plant

Project name Construction of sand-blasting plant
Location of the project Korenovskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Planned to build sandblaster shop in the Korenovsky district
Project capacity Annual production of services - up to 70,000 finished parts per year.
Financial estimation of the project
Total cost of the project, mln rubles 12,0 mln. rbl.
Investment capacity, mln rubles 12,0 mln. rbl.
Conditions of investor participation Direct investments
Payback period 3,2 years
Land characteristics
Location Krasnodar region, Korenovsky district, Novoberezanskoe rural settlement, x. Proletarskiy
Land plot area (m2) 7000 m2
Ground categories Earth settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply connection point - from power lines on the street. Tsentralnaya 100
Gas supply expansion of the system timing n. Novoberezanskogo, the point of connection from an existing pipeline on the Tsentralnoy street 400
Water supply connection point - from the water passing along the street. Central, the volume of water consumption - 2.0 m3/day 500
Sewerage system central pressurized sewer network, wastewater volume 2.0 m3/day, on the street. Tsentralnaya 0,6
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Korenovsk city 35
Center of federal subject Krasnodar city 95
Highway (regional, federal significance) M4 Don 19
Roads of local significance Tsentralnaya street 0,3
Nearest railway station Korenovsk city 37
Nearest railway lines 22
Airport Krasnodar 104
Seaport Novorossiysk 340