Project name |
Construction settlement a beach with an infrastructure In item Mostovskoy |
Location of the project |
Mostovskoy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of a beach zone with objects of an infrastructure will allow to provide having a rest comfortable and various rest. The basic groups of potential consumers of services are inhabitants of settlement and all area as a whole, tourists having a rest on territory of area Mostovskogo. |
Project capacity |
26509 thousand ruble. a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
55 million ruble |
Investment capacity, mln rubles |
55 million ruble |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
6,4 years |
Land characteristics |
Location |
Krasnodar territory, item Mostovskoy, east part (in area of stadium and street of Quay) |
Land plot area (m2) |
15300,00 |
Ground categories |
The Earth of settlements (in using wood fund) |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Electric line – 10 kw |
|
Gas supply |
- |
- |
Water supply |
d=90 mm |
200 |
Sewerage system |
d=400 mm |
1500 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Mostovskoj town |
|
Center of federal subject |
Krasnodar city |
250 |
Highway (regional, federal significance) |
Labinsk city - Mostovskoj town – Border of Karachaevo Circassian republic |
2 |
Roads of local significance |
Mostovskoj - Psebaj |
0,1 |
Nearest railway station |
Mostovskoj |
3 |
Nearest railway lines |
Mostovskoj |
3 |
Airport |
Krasnodar city |
250 |