Construction of a trading pavilion

Project name Construction of a trading pavilion
Location of the project Uspenskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence In the building of trading pavilion is planned location of following premises: - a trading premise; - a premise for acceptance, storage and preparations of the goods for sale.
Project capacity The pavilion sales area makes 80 sq.m. On a share of the trading floor is necessary 67 % of a total area of the shop.
Financial estimation of the project
Total cost of the project, mln rubles 2,927 mln.rub
Investment capacity, mln rubles 2,927 mln.rub
Conditions of investor participation Direct investment
Payback period 3 years
Land characteristics
Location Krasnodar region, Uspensky district, village Uspenskoe, Klara Cetkin St
Land plot area (m2) 250 sq.m.
Ground categories Lands of settlement.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply TS 10/0,4 kW, 10 kW 10
Gas supply D=80 mm 15
Water supply D=100 mm 18
Sewerage system - The leak-tight cesspool with the subsequent export of drains on sewer treatment facilities.
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center central part of the v.Uspenskoe 1
Center of federal subject City Krasnodar 250
Highway (regional, federal significance) Federal road “Caucasus” 2
Roads of local significance «Uspenskoe-Armavir» 0,01
Nearest railway station rail road station “Konokovo” 3
Nearest railway lines rail road station “Konokovo” 3
Airport Airport – city Krasnodar 250
Seaport city Novorossisk 360