Project name |
Parking of heavy vehicles to the store |
Location of the project |
Pavlovskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
The project brings together a number of services for food, trade, accommodation |
Project capacity |
35 919 thousand rubles. in year |
Financial estimation of the project |
Total cost of the project, mln rubles |
22 mill. rbl |
Investment capacity, mln rubles |
22 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
2 years |
Land characteristics |
Location |
Krasnodar Region, village Pavlovsk, Eastern Industrial Zone |
Land plot area (m2) |
56 000 (m2) |
Ground categories |
The grounds of a settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Necessary to construct the substation 110/10 kV with two power transformers of 20.0 MVA with the capacity of |
45 |
Gas supply |
Pipeline of high-pressure d = 225 mm, 3 atm. |
1750 |
Water supply |
Construction of artesian wells |
within the boundaries of the land |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
st-ca Pavlovskaya |
0,4 |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
road of federal "Don" |
0,085 |
Roads of local significance |
- |
0,03 |
Nearest railway station |
railway station "Sosyka - Rostov" |
0,8 |
Nearest railway lines |
- Local railway owned closed joint stock company "Ñhemistry" |
0,2 |
Airport |
The Krasnodar |
145 |
Seaport |
The Eisk |
140 |