Organization of dry cleaning activity

Project name Organization of dry cleaning activity
Location of the project Otradnenskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Type of construction - new construction. During realization of the project construction of an administrative-industrial block (300-600 m2), blocks (grounds) for a dry-cleaner of interiors of cars (50-100 m2), and parking for motor transport of customers (up to 20places) is supposed. The accomplishment of ad-joining territory (small architectural forms) also is supposed. The construction of access roads, construction of engineering com-munications and delivery of the industrial equipment is provided.
Project capacity Following kinds of services of the projected enterprise of a dry-cleaner are planned: - Cleaning clothes (from 17 600 kg up to 35 200 kg/years); - Cleaning curtains, jalousie (1 500 - 1 900 kg/years); - Cleaning carpets and carpet coverings (6 100-13 000 kg/years); - Cleaning soft and leather furniture (100 items/year)
Financial estimation of the project
Total cost of the project, mln rubles 29,332 mln. rub.
Investment capacity, mln rubles 29,332 mln. rub.
Conditions of investor participation Direct investment (100%)
Payback period 4,2 years
Land characteristics
Location Krasnodar region, Otradnaya, Otradnensky area, in 400 meters to north east of house ¹ 48 on street Kazachiya
Land plot area (m2) 2500 sq. m.
Ground categories Agricultural lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply ÊTP-100ÊVÀ, Line-0,4kW Power supply PS 110/35/10kW «Otradnaya-110», construction of an electric line - 130 meters is ne-cessary
Gas supply No need
Water supply Vtank=10m3 In connection with absence of the necessary debit of water on a water system of village Otradnaya and absence of a water planting network in the given part of a village Otradnaya it is necessary to provide an independent source of water supply.
Sewerage system Vseptic=7,2m3, Dpipe=100-150mm Distance from a septic tank up to buildings to sus-tain according to building norms, 5-6 meters, not closer.
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center village Otradnaya 0
Center of federal subject city Krasnodar 300
Highway (regional, federal significance) Rostov-on-Don – Makhachkala 80
Roads of local significance village Otradnaya – town Armavir 0,160
Nearest railway station town Armavir 80
Nearest railway lines town Armavir 80
Airport town Armavir 80
Seaport town Novorossiysk 420