Project name |
Reconstruction of a part of the building not completed by construction Club of Culture into tourist base with operation of 15 tourist routes |
Location of the project |
Otradnenskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
The basic advantage of the given enterprise will be high quality of services and rather low prices on region. Construction of a recrea-tional zone is supposed in territory of Otradnensky district, village Peredovaya, on the ground area the area 8420 sq.m. On the given ground area reconstruction of a part of the building of the Club Culture not completed by construction for a building of tourist base is planned. A total area of a reconstructed building 880 sq.m. in-cluding: - 360 sq.m., - 15 rooms «economy class» - 252 sq.m., - 7 rooms "de luxe" - 94 sq.m., - a hall - 70 sq.m., - cafe - 30 sq.m., - reception - 74 sq.m., - administrative - household premises |
Project capacity |
Total area of the reconstructed building 880 sq.m., including - 360 sq.m., - 15 rooms « economy class » - 252 sq.m., - 7 rooms " de luxe" - 94 sq.m., - a hall - 70 sq.m., - cafe - 30 sq.m., - reception - 74 sq.m., - administrative - household premises - A parking lot for cars on 20 ìcar places; The planned volume of proceeds from realization of services in a year is made with 13590 thousand roubles. |
Financial estimation of the project |
Total cost of the project, mln rubles |
29,798 mln. rub. |
Investment capacity, mln rubles |
29,798 mln. rub. |
Conditions of investor participation |
Direct investment (100%) |
Payback period |
4,5 years |
Land characteristics |
Location |
Otradnensky district, village Peredovaya st. Lenina |
Land plot area (m2) |
8420 sq. m. |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
ÊÒP-10/0,4 kV PÂ-396 |
30 (power supply: PS 35/10kV «Peredovaya») |
Gas supply |
- |
Not stipulated |
Water supply |
D pipe = 100 mm / pres-sure in the net 5 atm. (existing water main line) D pipe = 40 mm (planned water main line) |
300 m (st. Piketnaya – st. Kirova) |
Sewerage system |
D pipe = 150-200 mm, V septic= 50 m 3 |
Distance up to industrial buildings to sustain, ac-cording to building norms ( ÑÍ è Ï 89-80) – not less 5-6 meters from buildings (constructions) |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
village Otradnaya |
30 |
Center of federal subject |
city Krasnodar |
330 |
Highway (regional, federal significance) |
Rostov-on-Don – Makhachkala |
110 |
Roads of local significance |
village Otradnaya – settlement Ilich |
0,5 |
Nearest railway station |
station “Armavir – Rostovskiy” |
110 |
Nearest railway lines |
town Armavir |
110 |
Airport |
town Armavir |
110 |
Seaport |
town Novorossiysk |
470 |