Project name |
Building of a multifuel gasoline station with a complex of roadside service |
Location of the project |
Apsheronskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Implementation of the project shall ensure transit and local motor transport with high-quality fuel and production for service of cars, Rendering of services in leaving and car repairs |
Project capacity |
250-300 refuellings a day |
Financial estimation of the project |
Total cost of the project, mln rubles |
40 |
Investment capacity, mln rubles |
40 |
Conditions of investor participation |
Direct investment |
Land characteristics |
Location |
Krasnodar Region, Apsheronsk, Kommunisticheskya street |
Land plot area (m2) |
21 000 |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From existing networks on Kommunisticheskya street |
100 |
Gas supply |
From existing networks on Kommunisticheskya street |
500 |
Water supply |
Building of bringing networks from a waterpipe on Gorkogo street is necessary |
2100 |
Sewerage system |
Building of bringing networks from a waterpipe on Gorkogo street is necessary |
2300 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Apsheronsk |
0 |
Center of federal subject |
Krasnodar |
115 |
Highway (regional, federal significance) |
Road Maikop – Tuapse |
0,02 |
Nearest railway station |
Nearest railway station Apsheronsk |
3,5 |
Nearest railway lines |
Railroad from Apsheronsk |
3,5 |
Airport |
Krasnodar |
100 |
Seaport |
Tuapse |
|