Project name The printing house organisation
Location of the project Abinskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence The project involves the establishment of the enterprise complete process chain, including design studio, prepress with the withdrawal of photographic film, producing forms
Project capacity 19 688 thousand rubles.
Financial estimation of the project
Total cost of the project, mln rubles 12,6
Investment capacity, mln rubles 12,6
Conditions of investor participation Direct investments, extra means
Payback period 2,7 years
Land characteristics
Location v. Varnavinsky, street Red
Land plot area (m2) 1000
Ground categories land settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from passing near the site of power lines 200
Gas supply Rural Pipeline 100
Water supply Rural water supply 200
Sewerage system no local treatment facilities construction septic tanks
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center city Abinsk 20
Center of federal subject city Krasnodar 100
Highway (regional, federal significance) The highway Krasnodar - Novorossisk 20
Roads of local significance Arenít present Nearby
Nearest railway station Abinsky, linear 25, 35
Nearest railway lines Krasnodar-Novorossisk 25
Airport Krasnodar, Anapa 120, 100