Project name |
The printing house organisation |
Location of the project |
Abinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
The project involves the establishment of the enterprise complete process chain, including design studio, prepress with the withdrawal of photographic film, producing forms |
Project capacity |
19 688 thousand rubles. |
Financial estimation of the project |
Total cost of the project, mln rubles |
12,6 |
Investment capacity, mln rubles |
12,6 |
Conditions of investor participation |
Direct investments, extra means |
Payback period |
2,7 years |
Land characteristics |
Location |
v. Varnavinsky, street Red |
Land plot area (m2) |
1000 |
Ground categories |
land settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from passing near the site of power lines |
200 |
Gas supply |
Rural Pipeline |
100 |
Water supply |
Rural water supply |
200 |
Sewerage system |
no |
local treatment facilities construction septic tanks |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Abinsk |
20 |
Center of federal subject |
city Krasnodar |
100 |
Highway (regional, federal significance) |
The highway Krasnodar - Novorossisk |
20 |
Roads of local significance |
Aren’t present |
Nearby |
Nearest railway station |
Abinsky, linear |
25, 35 |
Nearest railway lines |
Krasnodar-Novorossisk |
25 |
Airport |
Krasnodar, Anapa |
120, 100 |
Seaport |
Novorossisk, Temryuk |
90, 120 |