Project name |
Building of objects of car-care centre with a full complex of services |
Location of the project |
Timashevskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction in the area Timashevsk complex consisting of a showroom, service center, department stores, hotels. |
Project capacity |
Hotel with 50 seats, car by 4 PBX showroom area of 1000 sq.m and a store with sales area of 200 sq.m. |
Financial estimation of the project |
Total cost of the project, mln rubles |
41,6 million rbl |
Investment capacity, mln rubles |
41,6 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
6,1 years |
Land characteristics |
Location |
Krasnodar territory, Timashevsky area, motorway Krasnodar-Yeysk, turn on farm Peace |
Land plot area (m2) |
14277 sq.m |
Ground categories |
The earths of settlement |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Electric main – 10 kw |
30 |
Gas supply |
High pressure gas pipeline, steel, diameter 150 mm |
800 |
Water supply |
Projected chink and networks |
Building of an artesian chink and water supply systems |
Sewerage system |
Projected local treatment facilities |
Building of a three-chambered septic tank of mechanical clearing. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Timashevsk |
12,0 |
Center of federal subject |
city Timashevsk |
65 |
Highway (regional, federal significance) |
Motorways Krasnodar-Yeysk |
0,025 |
Roads of local significance |
Street Quay |
2,0 |
Nearest railway station |
Station Timashevsk |
15 |
Nearest railway lines |
Sugar factory |
8 |
Airport |
The city of Krasnodar |
75 |
Seaport |
city Novorossisk |
152 |