Construction Market Hall

Project name Construction Market Hall
Location of the project Timashevskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Building on the territory of a rural settlement Medvedovsk modern covered market that can satisfy the demand for retail space, creating conditions for effective trade, acquisition of necessary goods by local residents for not leaving this to the district center.
Project capacity 6000 sq.m
Financial estimation of the project
Total cost of the project, mln rubles 46,4 million rbl
Investment capacity, mln rubles 46,4 million rbl
Conditions of investor participation Direct investments
Payback period 3,2 years
Land characteristics
Location Krasnodar region, Timashevsky area st.Medvedovskaya, ul.Chongarskaya, 16 F
Land plot area (m2) 6026 sq. m
Ground categories The earths of settlement
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Electric main – 10 kw 35
Gas supply High pressure gas pipeline, steel, diameter 65 mm 40
Water supply steel, diameter 150 mm 25
Sewerage system Projected local treatment facilities Building of a three-chambered septic tank of mechanical clearing.
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center city Timashevsk 20,0
Center of federal subject city Krasnoda 65
Highway (regional, federal significance) Motorways Krasnodar-Yeysk 2,0
Roads of local significance 0,02
Nearest railway station 1,6
Nearest railway lines 1,6
Airport The city of Krasnodar 75
Seaport city Novorossisk 152