Project name |
Construction of hotel-trading complex on motorway Temryuk – Krasnodar - Kropotkin |
Location of the project |
Tbilisskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of hotel-trading complex on motorway Temryuk – Krasnodar – Kropotkin. It is planned to grant a wide assortment of goods and services parallel with auto stop |
Project capacity |
Hotel within 70 rooms |
Financial estimation of the project |
Total cost of the project, mln rubles |
190 mln. rbl. |
Investment capacity, mln rubles |
190 mln. rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
5 year |
Land characteristics |
Location |
Motorway Temryuk – Krasnodar – Kropotkin in 200 m to the east direction from Novovladimirskaya circle road |
Land plot area (m2) |
40000 sq.m |
Ground categories |
Settlements land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from existing power station 110/35/10 kw |
1000 |
Gas supply |
from existing gas pipe |
- |
Water supply |
from existing water pipe d-110mm., free pressure in net 1,5 atm. |
2600 |
Sewerage system |
local |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Tbilisskaya village |
|
Center of federal subject |
Krasnodar city |
100 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
0,15 |
Roads of local significance |
existing road with gravel surfacing |
0,2 |
Nearest railway station |
station of Grechishkino |
2,8 |
Nearest railway lines |
Krasnodar-Kropotkin |
2,6 |
Airport |
airport of Krasnodar |
90 |
Seaport |
port of Novorossiysk |
280 |