Project name |
Construction of universal shop |
Location of the project |
Kurganinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
It is included the construction and work organization of universal shop in st.Rodnikovskaya. Project includes high effective activity with the wide goods assortment and usage of buyers self-service principle |
Project capacity |
It is planned to sell services to 12,6 mln consumers a year, planned income is 1 000 000 rubles a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
2,537 mln. rub |
Investment capacity, mln rubles |
2,537 mln. rub |
Conditions of investor participation |
Direct investments |
Payback period |
4,75 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district, stanitsa Rodnikovskaya, Privokzalnaya street, 126b |
Land plot area (m2) |
1 580 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From the operating LEP 0,4 kV, draw-off point KTP P-5-68 |
20,0 |
Gas supply |
Not required |
- |
Water supply |
Water supply system on the Privokzalnaya street |
350,0 |
Sewerage system |
Septic system |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
11,0 |
Center of federal subject |
Krasnodar city |
190,0 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,4 |
Roads of local significance |
Privokzalnaya street |
0,01 |
Nearest railway station |
Kurgannaya station |
20,2 |
Nearest railway lines |
Kurganinsk-Shedok |
0,4 |
Airport |
Krasnodar city |
193,0 |
Seaport |
Tuapse city |
350,0 |