Project name |
Construction of roadside service |
Location of the project |
Kurganinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of roadside service includes construction of general building, another structure and organization of communication. General service types are food service, car service station, auto parts shop |
Project capacity |
Car-washing service – 1000 cars a year, food service – 36 000 customers a year, car-diagnosing service – 720 ones a year, auto parts sale – 13 560 ones a year, car service – 12 960 standard hours |
Financial estimation of the project |
Total cost of the project, mln rubles |
10,124 mln.rub |
Investment capacity, mln rubles |
10,124 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
3,75 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district, along the road Armavir-Kurganinsk |
Land plot area (m2) |
1350 sq.m. |
Ground categories |
Ground of industry, power engineering, transport and communication |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From the operating LEP 0,4 kV |
10,0 |
Gas supply |
Not required |
- |
Water supply |
Construction of tubular well |
On the land plot |
Sewerage system |
Not required |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
15,0 |
Center of federal subject |
Krasnodar city |
185,0 |
Highway (regional, federal significance) |
Armavir-Kurganinsk |
0,05 |
Roads of local significance |
Armavir-Kurganinsk |
- |
Nearest railway station |
Kurgannaya station |
16,8 |
Nearest railway lines |
Kurganinsk-Tuapse |
0,1 |
Airport |
Krasnodar city |
188,0 |
Seaport |
Tuapse city |
350,0 |