Project name |
Construction of the rose growth nursery |
Location of the project |
Kurganinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Project includes the construction of hothouses and other structure |
Project capacity |
Productivity of one bush is 15-25 roses a year and 2,8 mln. ones a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
27,029 mln.rub |
Investment capacity, mln rubles |
27,029 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
2 years |
Land characteristics |
Location |
Krasnodar region, town Kurganinsk, Rodnikovskoe highway,7 |
Land plot area (m2) |
22 272 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-0,4 kV, additional construction of 3 pylons |
250,0 |
Gas supply |
Low pressure gas pipeline on the territory of the Ltd. “Agroprompererabotka” |
0,015 |
Water supply |
Water supply system in st.Rodnikovskaya on the Privokzalnaya street, pipe diameter 140 mm |
500 |
Sewerage system |
In the operating sewerage system in st.Rodnikovskaya on the Karla Marksa street, pipe diameter 200 mm |
2000 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
11,0 |
Center of federal subject |
Krasnodar city |
190,0 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
0,03 |
Roads of local significance |
Pervomayskaya street |
0,01 |
Nearest railway station |
Kurgannaya station |
20,2 |
Nearest railway lines |
Kurganinsk-Shedok |
0,3 |
Airport |
Krasnodar city |
193,0 |
Seaport |
Tuapse city |
350,0 |