Construction of the rose growth nursery

Project name Construction of the rose growth nursery
Location of the project Kurganinskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence Project includes the construction of hothouses and other structure
Project capacity Productivity of one bush is 15-25 roses a year and 2,8 mln. ones a year
Financial estimation of the project
Total cost of the project, mln rubles 27,029 mln.rub
Investment capacity, mln rubles 27,029 mln.rub
Conditions of investor participation Direct investments
Payback period 2 years
Land characteristics
Location Krasnodar region, town Kurganinsk, Rodnikovskoe highway,7
Land plot area (m2) 22 272 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL-0,4 kV, additional construction of 3 pylons 250,0
Gas supply Low pressure gas pipeline on the territory of the Ltd. “Agroprompererabotka” 0,015
Water supply Water supply system in st.Rodnikovskaya on the Privokzalnaya street, pipe diameter 140 mm 500
Sewerage system In the operating sewerage system in st.Rodnikovskaya on the Karla Marksa street, pipe diameter 200 mm 2000
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 11,0
Center of federal subject Krasnodar city 190,0
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 0,03
Roads of local significance Pervomayskaya street 0,01
Nearest railway station Kurgannaya station 20,2
Nearest railway lines Kurganinsk-Shedok 0,3
Airport Krasnodar city 193,0
Seaport Tuapse city 350,0