Project name |
Public entertaining center construction |
Location of the project |
Kurganinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Fundamental construction of cover building on the prepared plot with the usage of quickly erected construction technologies, buying of equipment for sport and entertaining zone, territory improvement and landscape gardening are included in project |
Project capacity |
Expected enterprise share in the service production is about 35 % in the total volume of services in Kurganinsk town what corresponds to the servicing of 18000 people a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
56,297 mln.rub |
Investment capacity, mln rubles |
56,297 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
5,8 years |
Land characteristics |
Location |
Krasnodar region, Kurganinsky district,Kurganinsk town, Tamanskaya street,25 |
Land plot area (m2) |
14 156 sq.m. |
Ground categories |
residential places ground |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From PT-111 |
5,0 |
Gas supply |
From the operating high pressure gas pipeline, diameter 150 mm |
7,0 |
Water supply |
From the operating water supply system steel pipe diameter 100 mm |
4,0 |
Sewerage system |
In the operating sewerage system cast iron pipe diameter 300 mm |
12,0 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Kurganinsk town |
0 |
Center of federal subject |
Krasnodar city |
175 |
Highway (regional, federal significance) |
Ust-Labinsk-Labinsk-Upornaya |
2,2 |
Roads of local significance |
Mira street |
2,2 |
Nearest railway station |
Kurgannaya station |
4,0 |
Nearest railway lines |
Armavir¬-Tuapse |
4,5 |
Airport |
Krasnodar city |
178 |
Seaport |
Tuapse city |
350 |