Project name |
Warehouse for Storage of Raw Material and Finished Goods Placement |
Location of the project |
Ust- Labinskiy district |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
Construction of a warehouse for storage of raw material and finished goods, such as: roofing materials and part, and also rendering of accompanying services in realization of roofing works (stacking of a roofing covering, arrangement of a contiguity of a roofing material, installation of a clamping rod with application sealant and etc.) |
Project capacity |
86 400 quadrate meters |
Financial estimation of the project |
Total cost of the project, mln rubles |
30 mln. Rub |
Investment capacity, mln rubles |
30 mln. Rub |
Conditions of investor participation |
Direct investments |
Payback period |
3 years |
Land characteristics |
Location |
Krasnodar region, Ust-Labinsk ul. Kavkazskaya |
Land plot area (m2) |
10 800 (sq.ì.) |
Ground categories |
Area of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
100 kilowatt |
300, ul. Kavkazskaya |
Gas supply |
- |
- |
Water supply |
d75 ìì; 1,5 atmospheres |
Drilling of an own chink |
Sewerage system |
- |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
t. Ust-Labinsk |
1,5 |
Center of federal subject |
Krasnodar city |
55 |
Highway (regional, federal significance) |
Temryuk-Krasnodar-Kropotkin |
1,0 |
Roads of local significance |
Volnaya Str. |
1,5 |
Nearest railway station |
Ust-Labinskaya |
1,5 |
Nearest railway lines |
t. Ust-Labinsk |
1,5 |
Airport |
c. Krasnodar |
55,0 |
Seaport |
c. Novorossiysk |
230,0 |