Roadside Cafe Construction

Project name Roadside Cafe Construction
Location of the project Ust- Labinskiy district
Industry classification Consumer sphere
Basic information about the project
Project essence The investment project supposes Roadside Cafe Construction
Project capacity Proceeds – 14 062 thousand rbl.
Financial estimation of the project
Total cost of the project, mln rubles 6,1 mln. Rub
Investment capacity, mln rubles 6,1 mln. Rub
Conditions of investor participation Direct investments
Payback period 2 years
Land characteristics
Location Krasnodar region, Ust-Labinsk district, Ust-Labinsk, motorway Temryuk – Krasnodar – Kropotkin (to the west of Radio relay station)
Land plot area (m2) 500 (sq.ì.)
Ground categories Area of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 10 kilowatt 400,0
Gas supply - -
Water supply d100 mm, 2,0 cubic meters per day 1350,0
Sewerage system d200 mm, 1,7 cubic meters per day 100,0
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center t. Ust-Labinsk 4,7
Center of federal subject Krasnodar city 67
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 0,05
Roads of local significance ul Kavkazskaya 1,4
Nearest railway station Ust-Labinskaya 1,9
Nearest railway lines t. Ust-Labinsk 1,9
Airport c. Krasnodar 62
Seaport c. Novorossiysk 263